Hydro Vision were engaged to design and install a pumping and irrigation system for Brisbane’s new parallel runway.

contoured green irrigation background
Brisbane Airport Runway Irrigation

PROJECT

Brisbane Airport New Parallel Runway

LOCATION

Brisbane

SUMMARY

With construction completed in mid-2020, Brisbane’s new runway and associated facilities was one of the largest aviation construction projects undertaken in Australia. 

The project involved a 4km long site and took over 2 years to complete. 
The irrigation requirements of the project saw the use of 1.2 billion litres of recycled water. 

Most of the areas requiring irrigation were either seeded or stolonised, requiring targeted, reliable irrigation. 

Our design considered system efficiency and achieved this by sizing the mainline network around the 4km long site, ensuring uniform sprinkler placement and the use of a custom-built variable speed multiple pumping system. A Flow Meter was installed to provide accurate daily forecasts of next day water use. 

 

Contact Us

At Hydro Vision we are always here to talk. Get in touch using the contact form or give us a call on 1300 787 003.

Contact Us

At Hydro Vision we are always here to talk, get in touch using the contact form or give us a call.

Scroll to Top

CONTACT US

Get in touch using the contact form below or head to our contact page to see how to find us.